Self-Performing Concrete Contractor

Parking Lot Striping & Pavement Marking

Layout, striping, and ADA pavement marking for new construction and restriping programs across Flower Mound and North Texas. We handle striping as part of our own paving scope or as a standalone subcontract for property owners and general contractors.

Sub-Bid or Direct

Your Concrete Partner for Parking Lot Striping & Pavement Marking

Striping is the last thing anyone notices about a parking lot until it's wrong-then it's the only thing anyone notices. Faded lines, mismatched ADA symbols, or a fire lane that doesn't line up with the actual travel path turn into code violations, failed inspections, and customers parking wherever they want.

We stripe new construction as part of our own concrete and paving scope, and we take standalone striping subcontracts for general contractors closing out a project or property owners restriping an aging lot. Either way, layout comes first: we verify ADA stall counts and van-accessible spacing against current code before paint goes down, not after.

Flower Mound and Denton County properties see enough sun and traffic that standard traffic paint fades faster than owners expect. We use durable line paint rated for Texas heat and offer thermoplastic marking for high-traffic fire lanes and crosswalks that need to hold up longer between restripes.

Our striping scope covers standard stall lines, ADA-compliant accessible spaces and van-accessible symbols, fire lane striping and curb painting to meet fire marshal requirements, directional arrows and stop bars, and custom layouts for specialty parking like reserved or EV-charging spaces. We coordinate directly with the fire marshal's office when a fire lane layout needs sign-off before a certificate of occupancy is issued.

Restriping projects come with their own wrinkle: the existing layout is rarely still code-compliant. Accessible stall ratios have tightened over the years, and a lot that met code a decade ago often falls short on van-accessible spacing today. We flag those gaps before painting over the old lines rather than repainting a layout that fails the next inspection.

Who We Serve

  • General contractors closing out new construction
  • Retail and office property owners restriping aging lots
  • Property management companies on maintenance contracts
  • Developers needing ADA-compliant layout verification
  • Industrial facilities requiring fire lane and traffic markings

Important

We bid this scope as a subcontractor to general contractors, and we contract directly with property owners and developers who want the concrete package handled on its own. Either way, our own crews do the work.

Self-Performed Scope

What We Deliver

We self-perform the concrete scope on your parking lot striping & pavement marking project with our own crews and equipment.

1

ADA stall count and layout verification

2

Standard parking stall striping

3

Van-accessible and accessible route markings

4

Fire lane striping and red curb painting

5

Directional arrows, stop bars, and crosswalks

6

Thermoplastic marking for high-wear areas

7

Signage coordination for accessible and fire lane requirements

Our Process

How We Deliver Your Project

01

Layout: Field measurement, ADA stall count verification

02

Code check: Fire lane and accessibility compliance review

03

Surface prep: Sweeping, old line removal if needed

04

Layout marking: Chalk or laser layout before paint

05

Striping: Line paint or thermoplastic application

06

Final walk: Verification against approved site plan

Example Project Capability

Retail Center Restriping

Location

FM 2499 Corridor, Flower Mound TX

Client Type

Retail property owner

Project Scope

Full restripe of a 180-space retail parking lot with ADA correction

Deliverables

  • 180 standard stalls restriped
  • 12 accessible stalls corrected to current van-accessible spacing
  • Fire lane striping and curb painting per fire marshal requirements
  • 4 new directional arrows at drive aisle intersections
  • Thermoplastic crosswalk at main entrance

Frequently Asked Questions

Questions About Parking Lot Striping & Pavement Marking

How often does a commercial parking lot need restriping?

Most lots need restriping every 2-3 years depending on traffic volume and sun exposure. High-traffic retail lots in North Texas often fade faster due to UV exposure and heat.

Do you verify ADA compliance before striping?

Yes. We check accessible stall counts against the current parking count, verify van-accessible spacing and access aisle widths, and flag any layout that doesn't meet current code before we paint-catching problems before an inspection does.

Can you stripe as a subcontractor for a GC closing out a project?

Yes. We regularly take standalone striping subcontracts to close out new construction, working from the approved site plan to deliver striping that matches what was permitted.

For GCs, Developers & Property Owners

Ready to Discuss Your Parking Lot Striping & Pavement Marking Project?

We bid this scope to general contractors and work directly with developers, property owners, and facility managers. Get a comprehensive concrete bid for your commercial or industrial project in Flower Mound and North Texas.

Parking Lot Striping & Pavement Marking | Commercial Concrete Contractor Flower Mound TX